| 1. | The temper embrittlement prediction of hydrogenation reactor material 加氢反应器材料回火脆化量预测 |
| 2. | Analysis of the damage to the material used in the hydrogenation reactor 在役加氢反应器材料损伤分析 |
| 3. | The study of surface cracks ream on overlay of hydrogenation reactor 热壁加氢反应器堆焊层表面裂纹扩展初析 |
| 4. | Stress analysis and intensity evaluation of top section of hydrogenation reactor 加氢反应器上半部应力分析与强度评定 |
| 5. | Abstract : the first china - made forge - welded hot wall hydrogenation reactor has safely operated for 10 years and the equipment is found to be in good condition of integrity after several inspections in service 文摘:我国自行研制的首台国产化锻焊结构热壁加氢反应器已安全运行10年,此间经几次在役检验,设备状况完好。 |
| 6. | These show the progress and development in the ten years in the domain of hot wall hydrogenation reactor technology and fully reflect the solid foundation and strength for developing such technology in china 表明了我国热壁加氢反应器技术十几年来的进步与发展,并充分体现了我国在开发该项技术方面具有的坚实基础及实力。 |
| 7. | Priority is given to development of heavy coal liquefaction and petrochemical equipment , heavy vessels for hydrogenation reactor and nuclear reactor and localization of heavy casting and forging for super - critical unit 重点开发煤液化和石油化工等重型设备,加氢反应器和核电等重型容器,超临界机组配套大型铸锻件,实现超临界机组国产化。 |
| 8. | Emphasis is placed on the industrial application of gamma scanning in tower operation and the neutron backscatter in the level detection of an industrial gas / liquid separator and a hydrogenation reactor 这些应用情况表明,利用射线检测技术不仅可以准确诊断石油化工设备的故障,还可以用于装置的运行状况评价、操作优化、挖潜增效以及实现预测维修等多个方面。 |